Month: October 2017

Quality Wind Inspection - Tumbler Ridge 2017

Automated Aerial Inspection is Implemented at Quality Wind Transmission Line

With the help of Aerionsense’s proprietary inspection automation software, Capital Power completed its annual condition assessment of the transmission line connecting Quality Wind (QW), to the electrical grid. QW is a 142-megawatt wind generation facility that plays an essential role to provide power to the local residents, thus making it

Continue reading